Categorized | News

Big Island lane closures for May 23-29, 2015

Umauma Bridge construction. August 24, 2014. Photography by Baron Sekiya | Hawaii 24/7

Umauma Bridge construction. August 24, 2014. Hawaii 24/7 File Photo

MEDIA RELEASE

PLEASE NOTE:
Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

In observance of Memorial Day, there will be no roadwork Monday, May 25

— HAWAII BELT ROAD (ROUTE 19) —

1) VICINITY OF KAAWALII GULCH

Alternating single lane closures on Hawaii Belt Road (Route 19) in both directions between Jardine Road and Old Mamalahoa Highway in the vicinity of Kaawalii Gulch on Tuesday, May 26, through Friday, May 29, from 8:30 a.m. to 3 p.m. for roadway improvements.

2) VICINITY OF LAUPAHOEHOE GULCH

Alternating single lane closures on Hawaii Belt Road (Route 19) in both directions between Jardine Road and Puualaea Homestead Road in the vicinity of Laupahoehoe Gulch on Tuesday, May 26, through Friday, May 29, from 8:30 a.m. to 3 p.m., for roadway improvements.

3) VICINITY OF PAPAIKOU TO WAINAKU

Alternating single lane closures on Hawaii Belt Road (Route 19) in both directions between Milepost Marker 7.8 and Milepost Marker 4.0 in the vicinity of Papaikou towards vicinity of Wainaku on Tuesday, May 26 through Friday, May 29, from 8:30 a.m. to 3 p.m. for roadway pavement reconstruction.

4) VICINITY OF PEPEEKEO TO HAKALAU

Alternating single lane closures on Hawaii Belt Road (Route 19) in both directions between Milepost Markers 10.0 and Milepost Marker 15.6 in the vicinity of Pepeekeo to Hakalau on Tuesday, May 26, through Friday, May 29, from 8:30 a.m. to 3 p.m. for roadway improvements.

5) VICINITY OF UMAUMA BRIDGE

Alternating lane closures on Umauma Bridge in the vicinity of Hakalau (Route 19, Milepost 16) in both directions over a twenty-four hour period, seven days a week for bridge rehabilitation. Travel speed on Umauma Bridge is reduced to 20-mph, and vehicles that exceed statutory size-weight limits will be reviewed on a case-by-case basis upon application of their respective oversize-overweight vehicle permits. Maximum width for any vehicle with permit passing over the bridge is 12 feet.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

RSS Weather Alerts

  • An error has occurred, which probably means the feed is down. Try again later.

 

Quantcast